Loudoun Museum
HomeExhibitsEducationFamily Fun History of Loudoun SupportAbout Us
Log Cabin
Loudoun Museum Galleries Closed

In late December, as the floor repairs in the Front Gallery neared completion, the preparations for the repairs to the North wall of the museum began with the temporary closing of the Children's Discovery Room. The optimistic expectations of museum staff, the Town of Leesburg, and Madigan construction team - that the repairs to the interior of the North wall would take about two weeks - were dashed when the removal of plaster and wall board revealed a more complicated situation. To protect the staff, museum volunteers and visitors, and the objects on view, the galleries have been closed and the exhibitions have been removed from not only the Children's Discovery Room, but the Middle and Hall Galleries. Follow the progress of the repairs (see photographs below) and watch for information about the reopening of the museum galleries. We apologize for the inconvenience and look forward to welcoming museum guests into the Loudoun Museum soon! Scout Programs and meetings will continue in the Log Cabin and First Friday Lectures will be offered off-site through the generosity of Museum friends. For more information call 703-777-7427 or email info@loudounmuseum.org.

 

January, 2010


Jack Stewart, volunteer, painting the front gallery.
Jack Stewart, volunteer, painting the front gallery.


Pam putting on a coat of Townhall Tan.
Pam putting on a coat of Townhall Tan.


Greg Friedmann, volunteer, cutting in around the handrail
with the new color.
Greg Friedmann, volunteer, cutting in around the handrail
with the new color.


Tom Finnigan, volunteer, prepping the ceiling.
Tom Finnegan, volunteer, prepping the ceiling.


Tom Finnigan protecting his head from dripping paint.
Tom Finnegan protecting his head from dripping paint.


Ron Little, volunteer, prepping the front gallery walls.
Ron Little, volunteer, prepping the front gallery walls.


Beth Little, volunteer, working on the front gallery walls.
Beth Little, volunteer, working on the front gallery walls.


John Detrich, volunteer, painting the door and trim in the front gallery.
John Detrich, volunteer, painting the door and trim in the front gallery.


Front gallery, Loudoun Street main entrance.
Front gallery, Loudoun Street main entrance.


Front gallery newly installed floor.
Front gallery newly installed floor.


December 29, 2009


Museum' Middle Gallery, shrouded cases
Museum's Middle Gallery, filled with shrouded exhibition cases.


December 18, 2009


Getting ready for the repairs on the north wall
Getting ready for the repairs on the North wall.


Plastic sheeting protects CDR
Plastic sheeting protects CDR.


December 17, 2009


Beginning to protect the stair case
Beginning to protect the stair case.


North wall, after removal of plaster and wall board
North wall, after removal of plaster and wall board.


December 22, 2009


Maple hardwood floors installed!
Maple hardwood floors installed!


December 3, 2009


New wall board on Loudoun Street wall
New wall board on Loudoun Street wall.


New wall board on East wall
New wall board on East wall.


Floor repair, Pam vacuuming layers of dust
Floor repair, Pam vacuuming layers of dust.


Floor repair, Beth cleaning staircase
Floor repair, Beth cleaning staircase.


Floor repair, Madigan Construction Co. team
Floor repair, Madigan Construction Co. team.


 

December 2, 2009


Floor repair, new flooring delivered
Floor repair, new flooring delivered.


Floor repair, subfloor completed
Floor repair, subfloor completed.


Floor repair, subfloor completed
Floor repair, subfloor completed.


Floor repair, subfloor completed
Floor repair, subfloor completed.


 

December 1, 2009


Front gallery, cutting wall board
Front gallery, cutting wall board.


Front gallery, East wall, after repair and insullation added
Front gallery, East wall, after repair and insullation added.


Front gallery, treating moisture problems on Wirt Street wall
Front gallery, treating moisture problems on Wirt Street wall.


 

November 30, 2009


Floor repair, gravel layer beneath textile case, November 30, 2009
Floor repair, gravel layer beneath textile case,
November 30, 2009.


November 23, 2009


Floor repair, laying subfloor, November 23, 2009
Floor repair, laying subfloor, November 23, 2009.


Floor repair, laying subfloor (2)
Floor repair, laying subfloor, November 23, 2009.


November 18, 2009


After all layers of original flooring and 20th century floor boards removed, 18 November 19, 2009
After all layers of original flooring and 20th century
floor boards removed, November 18, 2009.


JC Penney’s advertisement for ladies’ garments, including “step-ins” such as the one on view in the Museum’s Middle Gallery
JC Penney's advertisement for ladies' garments,
including "step-ins" such as the one on view
in the Museum's Middle Gallery (see below).


In center, silk “step-in” or cami-knickers, made about 1920 by Mary Katherine Cook Derring
In center, silk "step-in" or cami-knickers, made about
1920 by Mary Katherine Cook Derring.


November 17, 2009


Floor repair floor boards removed
Floor repair, Floor boards removed.


Floor repair, opening to basement reinforcement
Floor repair, opening to basement.


Newspaper found under the floor boards
Automobile advertisement from newspapers from
the '20s and'30's discovered under floorboards.


November 16, 2009


Front Gallery floor removal
Front Gallery floor removal.


Floor, early reinforcement
Floor, early reinforcement.


Floor, front door repair
Floor, front door repair.